Xtra News Community 2
April 16, 2024, 04:07:02 pm
Welcome, Guest. Please login or register.

Login with username, password and session length
News: Welcome to Xtra News Community 2 — please also join our XNC2-BACKUP-GROUP.
 
  Home Help Arcade Gallery Links BITEBACK! XNC2-BACKUP-GROUP Staff List Login Register  

Meanwhile, in Tararua Country....

Pages: 1 2 [3] 4 5   Go Down
  Print  
Author Topic: Meanwhile, in Tararua Country....  (Read 15024 times)
0 Members and 1 Guest are viewing this topic.
Newtown-Fella
Guest
« Reply #50 on: November 25, 2011, 02:48:13 pm »

Bandit rolls into Manawatu Gorge

NZ Transport Agency crews have finished cutting a path through dense bush to reach the top of the Manawatu gorge slip, and are clearing bush to establish a safe working platform for the earth moving equipment due to start benching (terracing) the slip early next week.

NZTA state highways manager David McGonigal says while the heavy wind and rain in the gorge this week had not increased the slip noticeably, it had made conditions at the top of the slip difficult.,

"We're very keen to get stuck in to clearing the slip, but we are also very mindful of the safety of our contractors. They are working in difficult conditions and it's essential that we establish a safe working platform before our drivers move in to start work."

Mr McGonigal said a key piece of equipment to be used in the slip clearance was a large Allis Charmers HD16 bulldozer that has had its blade removed and works a high-strength winch. The large machine - known as 'The Bandit' - would be vital to the benching process.

"This is a huge machine with extremely good torque and can winch up to 48 tonnes.  It's been used to recover everything from swamp Kauri logs to tipped over trains.  It will be half buried in the ground, and it will anchor our heavy machinery when it's working at the top of the slip face. It's a key element in our safety controls and has already proved its worth in cutting the track to the top.

"The team also had to enlist the help of a helicopter to get larger items of essential plant and equipment up to the top of the slip (including equipment storage and portaloos). Heavy rain has made conditions at the top of the slip very difficult, so we are working hard to get a safe working platform established before drivers start benching the slip on Monday."

Meanwhile, one of the three new slow vehicle bays on the Saddle Road is now complete and construction of the other two are well underway.

Crews are continually monitoring the state of this route and making repairs as required. Speed limits of 30km/hr are in place along the alternative routes to calm traffic through difficult sections of road and a work programme is underway to complete the necessary repairs as soon as possible. This includes teams working at night. Following discussions with the NZTA, Horizons Regional Council has also advised that the stretch of Manawatu River 200 metres either side of the slip will be closed from Monday 28 November until the land above is stable. This is to protect all river users from falling debris that may be dislodged from the earthworks above.

The NZTA has also set up a dedicated Manawatu Gorge web page, which will be updated regularly with all the latest information: www.nzta.govt.nz/manawatu-gorge

http://nz.news.yahoo.com/a/-/top-stories/12024874/bandit-rolls-into-manawatu-gorge/

Report Spam   Logged

Pages: 1 2 [3] 4 5   Go Up
  Print  
 
Jump to:  

Powered by EzPortal
Open XNC2 Smileys
Bookmark this site! | Upgrade This Forum
SMF For Free - Create your own Forum


Powered by SMF | SMF © 2016, Simple Machines
Privacy Policy
Page created in 0.032 seconds with 16 queries.